OUR HISTORY

OUR HISTORY

Halis Cebi, The Chairman, President and C.E.O. has premiered his legacy of iron and steel industry in Karabuk, a city of North Turkey on the Black Sea, where he built the first Rolling Mill in 1964. His entrepreneurial spirit and overwhelming consciousness to expand amid growing in 1979 has prominently fomented his career by a second contemporary Rolling Mill in Gebze in order to increase his share in the sector and to make a contribution to the development of the iron and steel sector in Turkey.

In 1986, to adverse effects on the continuity of the production, meet the raw material needs and make an important breakthrough in the sector, ÇEBİTAŞ DEMİR ÇELİK ENDÜSTRİSİ A.Ş decided to make an investment in Aliağa/İzmir by starting operation of an Iron and Steel integrated plant. In 1989, ÇEBİTAŞ started to produce steel billets with a complete steel plant by Swedish technology.

MELT SHOP REVISION TIMELINE:

  • 1989 – Melt shop was established.  ASEA EAO 55 Ton liquid steel capacity, 48 MVA Transformer capacity
  • 1994 – The oxygen facility purchased from SIAD MACHINE was installed. Capacity of 3.300 Nm3.
  • 1995 – Revision was made to EAF. TAGLIAFERRI, EBT Type bottom casting technology was used. BSE - KARK Current Carrier Branches were installed with EAF 75 Ton liquid steel capacity and 72 MVA Transformer capacity. Crucible Furnace with 10 MVA Transformer capacity was revised. SDM was set out from 4 paths to 6 paths. BSE Lance Manipulator 3.600 m3 / hour capacity and Carbon Injection Systems were also installed.
  • 1996 – DANECO - ITALY 1.500.000 m3 / hour capacity dust collection system was installed.
  • 2002 – CONSO Oxy-Gas Brulor System was installed.
  • 2015 – EMPERE Electrode Regulation System was installed.
  • 2015 – ABB meltdown and electrode regulation system SPIE / EMPERE were renewed.
  • 2015 – O2 and CH4 booths were renewed with SMS CONCAST.
  • 2018 – 90 MVA Transformer and 34,021 MVar reactor were commissioned.
  • 2020 – The existing CCM has been revised.


Seeing the productivity and economy of the integrated plants, ÇEBİTAŞ started production in the rolling mill unit that was modernized with the ABB Technology bought from France. After this process, the rolling mill plant increased its capacity to 120 tons/h with the Italian technology furnace ‘Forni e Combustione’ in 2009.

ROLLING MILL REVISION TIMELINE:

  • 1994 - Rolling mill facility was installed
  • 1995 - ABB automation system was established.
  • 1998 - Termex system was introduced.
  • 2004 - Holtech Slit system application began.
  • 2006 - The construction of new stock halls was completed.
  • 2008 - Rolling mill platform was extended from 56 meters to 84 meters.
  • 2008 - New packaging system was built.
  • 2009 - Forni e Combustione a new annealing furnace with a capacity of 120 tons / hour was installed.